Magma Flood Control District – Magma II

This project had a very high profile. Significant resources were allocated by the Owner and Ringo Canyon on quality control during the entire production time frame. 14,000 tons of D-50 5” rock, D-50 8” rock, and D-50 12” rock were produced and shipped to the project. Products were produced on a contract basis and incrementally inspected at our quarry site prior to delivery. Production spanned a  4+ month time frame and delivery spanned a 3 month period. Other area rock sources were considered for this project prior to the agreement with Ringo Canyon being consummated. These other sources were not acceptable to the Owner’s Engineers primarily due to the issue of elongation. Our rock being more evenly proportioned was acceptable to the Owner.